Sign In | Join Free | My bushorchimp.com
China Qingdao Ruly Steel Engineering Co.,Ltd logo
Qingdao Ruly Steel Engineering Co.,Ltd
One-stop service for steel structure project
Verified Supplier

7 Years

Home > Steel Structure Warehouse >

PU Sandwich Hot Rolled H Beam Q355B Steel Structure Warehouse

Qingdao Ruly Steel Engineering Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

PU Sandwich Hot Rolled H Beam Q355B Steel Structure Warehouse

Brand Name : Ruly Steel

Model Number : Ruly0241

Certification : SGS, BV, ISO

Place of Origin : China

MOQ : 300 Square Meter

Payment Terms : L/C, T/T, Western Union

Supply Ability : 20000 Square Meter Per Month

Delivery Time : 15 ~ 20 Days

Packaging Details : As request

Application : Light Steel Structure Warehouse

Features : Galvanized Metal Buildings

Type : Steel Structure Warehouse

Working scope : Design,Fabrication, Installation

Raw steel material : Q235B, Q355B, ASTM A36

Service life : 50 Years

Wall and Roof : Steel cladding sheet

Surface treatment : Painting

Contact Now

Low-cost economical prefabricated steel structure warehouse
Specification:
1) Main steel: Q345, Q235, Q345B, Q235B, etc.
2) Column and beam: welded or hot rolled H-beam
3) Connection method of steel structure: welding or bolt connection
4) Wall and roof: EPS, rock wool, PU sandwich, corrugated steel plate
5) Door: Roll up door or sliding door
6) Window: plastic steel or aluminum alloy window
7) Surface: hot dip galvanized or painted
8) Crane: 5MT, 10MT, 15MT more
Drawings and quotations:
1) Custom designs are welcome.
2) In order to give you accurate quotations and drawings, please let us know the length, width, eaves height and local weather. We will quote you promptly.

SPECIFICATION OF STEEL STRUCTURE MATERIAL:

Item name Specification Material Parameter Technical Treatment
Column H shape,Box,steel pipe,Hot rolled sheet Q235B,Q345B Paint or Hot dip galvanized
Beam H shape,steel Truss,Hot rolled sheet Q235B,Q345B Paint or Hot dip galvanized
Bracing Steel rod,Steel pipe,Angle steel Q235B,Q345B
Purling C or Z shape, purling Thickness:1.8mm~3.0mm Q235B,Q346B Hot dip galvanized
Wall and roof panel EPS,Rock wool,Pu,Glass wool Sandwich panel or Single sheet. Steel T=0.426~0.8mm,insulation T=50~150mm Alu-zinc 150g, Fluorocarbon paint
Door Sliding or rolling door Steel or Aluminum sheet,T=1.0~1.5mm Paint or Hot dip galvanized
Window alloy-Glass,Aluminium alloy-shutter T=1.0~2.0mm Alloy
Lighting panel FRP, T=1.5mm or T=1.8mm Coefficient of thermal expansion:2.2x10-5/cm/cm/℃ Light transmittance 85%
Ventilator Turbine ventilator, and electric type Steel,stainless steel,PC Paint or Hot dip galvanized,304
Gutter Galvanized or stainless steel plate T=2.0mm Hot dip galvanized,304
Downpipe PVC pipe,Color steel pipe T=0.5mm Φ110,160,200 Paint
Bolt Ordinary, high strength 10.9S,4.8s Hot dip galvanized
Anchor bolt Steel rod M24,M27 M30 Q235B

Characteristics
1. Wide span: single span or multiple spans, the max span is 36m without middle column.
2. Low cost and maintenance: unit price range from USD35/m2 to USD70/m2 according to customers request.
3. Fast construction and easy installation: time saving and labor saving.
4. Long using lifespan: up to 50 years.
5. Nice appearance.
6. Others: environmental protection, stable structure, High quake-proof, water proof and fire proof, and energy conserving.
Precautions for fixed packaging, loading and unloading, transportation and unloading of steel structure warehouse:
(1) Large lifting tools must have special personnel responsible for them, use them appropriately, and strictly observe
Lifting rules to prevent vibration, impact, deformation or damage during the lifting process.
(2) Special personnel must supervise when loading the truck, check the number and packaging of the truck,
Securely fix and increase the degree of looseness of necessary binding components to prevent loss.
(3) Maintain stability during transportation. When transporting vehicles, in the transportation of long, wide, and high objects, well-trained pilots must be accompanied by responsible personnel and place marks on the vehicles.
(4) Rough handling is not allowed. The handling, weight, and size of the loading and unloading personnel should be familiar with the parts, and check the slings and rigging of the harness to prevent accidents.
(5) Members go to the construction site and organize unloading and stacking areas in time.
(6) When handling parts of a crawler crane, attention should be paid to the surrounding terrain and air conditions to prevent the crawler crane from overturning and component collision.


Product Tags:

H Beam Steel Structure Warehouse

      

PU sandwich Steel Structure Warehouse

      

Q355B Steel Structure Warehouse

      
Buy cheap PU Sandwich Hot Rolled H Beam Q355B Steel Structure Warehouse product

PU Sandwich Hot Rolled H Beam Q355B Steel Structure Warehouse Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao Ruly Steel Engineering Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)